Skip to content

How to Set Up a Recurring Rental Inspection Schedule in Foundations

An inspection schedule tells Foundations how often a property or unit should be inspected. From the schedule, Foundations works out the actual date of the next inspection, keeps it up to date as you log inspections, and shows it on your Inspections card and your Property Event Dashboard.

See Inspections Overview for how inspections work as a whole.


Open the Property Detail or Unit Detail page, expand the Inspections card, and tap Create Inspection Schedule. The New Inspection Schedule form opens.

  • Inspection Type (required) — the kind of inspection: Routine, Move-In, Move-Out, Safety, or Other.
  • Frequency (required) — how often the inspection should happen. See Frequencies below.
  • Day of the Week, Day of the Month, or Next Inspection Date (required) — the field beside Frequency changes based on the frequency you pick. See Frequencies below.
  • Last Completion Date — turn this on if you have already done this inspection recently. See Already Completed an Inspection? below.
  • Notes — anything worth remembering about the schedule. Maximum 255 characters.

Tap Save Schedule to create it.


Frequency You Choose Inspection Happens
Weekly A day of the week Every week on that day
Bi-Weekly A day of the week Every two weeks on that day
Monthly A day of the month Every month on that day
Quarterly A day of the month Every three months on that day
Semi-Annually A day of the month Every six months on that day
Annually A date Every year on that date

The day you choose is the day inspections are scheduled for. It does not drift when you complete an inspection a little early or late, so a monthly inspection set for the 15th stays on the 15th.


When creating a schedule, you can turn on Last Completion Date if you have already done this inspection recently. The date defaults to today and cannot be in the future or more than 30 years in the past.

When it is on:

  • The completed inspection is added to your inspection history right away, using the notes from the form.
  • For weekly through semi-annual schedules, the first next due date is calculated from that completion instead of from today. See How the Next Due Date Works.
  • For annual schedules, you still choose the next inspection date yourself.

When it is off, the schedule starts fresh and only looks forward.


Foundations always stores and shows a real date for the next inspection. Here is how that date is set and kept up to date.

  • Weekly and Bi-Weekly — the next due date is the next occurrence of the weekday you chose, starting from today.
  • Monthly, Quarterly, and Semi-Annually — the next due date is the next occurrence of the day of the month you chose, starting from today.
  • Annually — the next due date is the date you picked.

If you set a last completion date, the next due date is calculated from that completion instead, following the spacing rule below.

Logging a scheduled inspection moves the next due date forward by one cycle, and keeps going until the date is far enough after the inspection you just logged. This means:

  • A schedule always lands back on its regular day, such as the 15th of the month.
  • If you were late and missed an entire cycle, the next due date skips ahead instead of landing in the past.
  • If you log an inspection early, the schedule still moves forward by one cycle.

To keep the next inspection from landing right on top of the last one, Foundations requires a minimum gap after each completed inspection, about half of the schedule’s cycle. If your regular day would fall sooner than that, the next due date moves to the following occurrence.

Frequency Minimum Gap After an Inspection
Weekly 3 days
Bi-Weekly 7 days
Monthly 15 days
Quarterly 45 days
Semi-Annually 90 days
Annually 180 days

For example, if a Monthly schedule is set for the 1st and you complete an inspection on September 28, the 1st of October would be only three days later. That is less than the 15-day minimum, so the next due date becomes November 1.


Tap the edit icon on the Inspections card to open the Edit Inspection Schedule form. You can change any of the schedule’s fields, and the form shows the Last Completed date and the Next Due date for reference.

If you change the frequency or the day of the week or month, Foundations recalculates the next due date, starting fresh from today and respecting the spacing rule above. This is also a handy way to move a schedule forward if you have fallen behind and want to start clean.

You are always in control of the next due date. In the edit form, change Next Due to any date within five years of today. A date you set this way applies to this one inspection only. After you log it, the schedule returns to its regular day and spacing. For Annual schedules, the next inspection date is the date field at the top of the form.

Turn Active off to pause a schedule without deleting it. A paused schedule does not generate events on your Property Event Dashboard, and all of its settings and history are kept. Turn Active back on to resume.


Tap the trash icon at the top of the Edit Inspection Schedule form and confirm to delete a schedule. Any inspections you already logged on the schedule are kept in your inspection history. After deleting a schedule, you can create a new one at any time.


An active schedule generates an Inspection Due event on your Property Event Dashboard on its next due date. Tapping the event opens the Property Detail or Unit Detail page for that inspection. See The Dashboard.


Was this page helpful?