CapEx Horizon
The CapEx Horizon helps you plan for the major capital expenditures that every rental property will eventually need. Roof replacements, HVAC systems, water heaters, appliances, and more all eventually need replaced and are a significant cost.
Rather than discovering a failing component with no savings buffer, the Horizon gives you a time-based view of what is coming and calculates how much you should be setting aside each month to be ready for it.
Accessing the CapEx Horizon
Section titled “Accessing the CapEx Horizon”From the Maintenance Hub page, tap the Planning tab, then select CapEx Horizon. Use the property picker to view items for a specific property.
The CapEx Horizon has two views:
- Item List — a scrollable list of all CapEx items for the property, sorted by estimated date.
- Horizon Summary — an aggregated view that organizes items into time bands with cost totals and your monthly savings targets.
Adding a CapEx Item
Section titled “Adding a CapEx Item”Tap the add button from the Item List to open the form. You can start from scratch or select a template to pre-populate common items. See Task and Item Templates.
CapEx Item Fields
Section titled “CapEx Item Fields”- Property (required) — the property this item belongs to.
- Unit — optionally scope the item to a specific unit within a Multi-Tenant property. For items that apply to the building as a whole — roof, foundation, exterior siding — leave this blank.
- Item Name (required) — a descriptive name for the component or project. Maximum 100 characters.
- Category — the type of expenditure. Options are: Roof, HVAC, Plumbing, Electrical, Structural, Exterior, Appliance, Flooring, Foundation, Paving, Other.
- Description — any additional context about this item. Maximum 255 characters.
- Estimated Cost (required) — the projected cost of the replacement or project. This is your best estimate and can be updated as you get quotes or as costs change.
- Estimated Date (required) — the projected date when the replacement or project will be needed. This drives both the time band placement in the Horizon view and the monthly savings target calculation.
- Last Replaced Date — when this component was last replaced or originally installed. Used in combination with Useful Life Years to suggest a next estimated date when planning recurring replacements.
- Useful Life Years — the expected lifespan of this type of component in years. Combined with the Last Replaced Date, this lets Foundations suggest when the next replacement will be needed.
- Condition Score — a 1 to 5 rating of the component’s current physical condition. 1 is poor; 5 is excellent. See Condition Score below.
- Priority — the urgency of this item: Low, Medium, High, or Critical.
- Status (required) — the current state of the item. See Item Statuses below.
- Recurring — mark an item as recurring if the component will need to be replaced on a cycle. When a recurring item is marked Completed, you can start the next cycle by creating the follow-on item.
- Linked PM Task — optionally link this CapEx item to a PM schedule task. See How the Two Tools Work Together.
- Notes — any additional notes about the item. Maximum 255 characters.
Item Statuses
Section titled “Item Statuses”An item’s status controls both how it displays in the Horizon and whether it is included in your monthly savings target.
| Status | Description | Included in Savings Target |
|---|---|---|
| Planned | Scheduled for future replacement or a project you are actively planning for. | Yes |
| In Progress | Work has started, procurement is underway, or the project is in the contracting phase. | Yes |
| Completed | The replacement or project is done. | No |
| Deferred | Postponed to a later date. Still visible on the Horizon for reference. | No |
Only Planned and In Progress items contribute to your monthly savings target. Completed and Deferred items remain visible in the list and Horizon view so your records stay complete, but they do not affect the financial calculations.
The Horizon View
Section titled “The Horizon View”The Horizon Summary organizes your CapEx items into five time bands based on their estimated date. This view gives you a higher-level read of where your financial exposure is concentrated over time rather than just a chronological list.
| Band | Window |
|---|---|
| Overdue | Estimated date has already passed |
| Within 1 Year | Due within the next 12 months |
| Within 2 Years | Due in the next 13–24 months |
| Within 5 Years | Due in the next 25–60 months |
| Beyond 5 Years | More than 5 years out |
Each band shows the number of items and the total projected cost for items in that window.
Monthly Savings Target
Section titled “Monthly Savings Target”The Horizon Summary calculates a Monthly Savings Target, which is the amount you should be setting aside each month across all of your Planned and In Progress CapEx items to have the funds ready by each item’s estimated date.
The calculation for each item works as follows:
- Divide the estimated cost by the number of months remaining until the estimated date.
- Overdue items contribute their full estimated cost to the target immediately since their savings window has already closed.
All items are summed to produce the total monthly savings target shown at the top of the Horizon Summary.
Monthly Benchmark
Section titled “Monthly Benchmark”If your property has a Current Valuation recorded on the Property Detail page, the Horizon Summary also shows a Monthly Benchmark alongside your savings target. This is calculated at 1.5% of the property’s current value per year, divided by 12.
This figure is based on the common real estate guidance of setting aside 1–2% of a property’s value annually for capital reserves. It gives you a reference point for whether your current savings target is in line with industry expectations for a property of that value.
If your savings target is significantly higher than the benchmark, it may reflect a cluster of upcoming replacements. If it is significantly lower, it could mean you are in a light capital period, or that you have items that have not been entered yet.
Condition Score
Section titled “Condition Score”The Condition Score is a 1 to 5 rating you assign to a component based on its current physical state, independent of its age.
- 1 — Poor — significant wear, visible deterioration, or functional issues. May need attention sooner than the estimated date.
- 2 — Fair — showing age or wear but still functional.
- 3 — Average — typical condition for its age.
- 4 — Good — well-maintained, minimal wear.
- 5 — Excellent — like-new or better than typical for its age.
This is useful when a component’s actual condition diverges from what the calendar alone would suggest. A 10-year-old roof on a northern property that has seen several harsh winters might be a 2, even if its useful life is rated at 20 years. Conversely, a well-maintained HVAC system that has been serviced on schedule every year might score a 4 or 5 and still have plenty of runway.
The condition score does not automatically adjust the savings target or estimated date. It is an informational field that gives you and anyone reviewing your records additional context about the real state of each component.
Useful Life and Auto-Projection
Section titled “Useful Life and Auto-Projection”The Useful Life Years and Last Replaced Date fields work together to help you estimate when a component will next need to be replaced without having to calculate it manually.
When both fields are populated, Foundations can suggest a next estimated date by adding the useful life in years to the last replaced date. You confirm and can adjust the suggestion before saving. The server does not set dates automatically.
Some common useful life benchmarks as a general reference:
| Component | Typical Useful Life |
|---|---|
| Asphalt shingle roof | 20–30 years |
| HVAC system | 15–20 years |
| Water heater | 8–12 years |
| Refrigerator | 10–15 years |
| Washer / dryer | 10–13 years |
| Carpet | 7–10 years |
These are general guidelines. Actual useful life depends on the quality of the original installation, how well the component has been maintained, and local environmental conditions.