PM Scheduler
The PM Scheduler (Also known as Preventive Maintenance in-app) helps you stay on top of the recurring maintenance tasks that keep your properties in good shape and help prevent bigger issues from developing. Tasks are set up once with a frequency, and the next due date advances automatically every time you log a completion. The schedule always stays current without manual updates.
Accessing the PM Scheduler
Section titled “Accessing the PM Scheduler”From the Maintenance Hub page, tap the Planning tab, then select Preventive Maintenance. Use the property picker to view tasks for a specific property. Tasks are listed in order of next due date so the most time-sensitive work appears at the top.
Adding a PM Task
Section titled “Adding a PM Task”Tap the add button from the Preventive Maintenance page to open the task form. You can fill it out from scratch or start from a template to pre-populate common tasks. See Task Templates below.
PM Task Fields
Section titled “PM Task Fields”- Property (required) — the property this task is associated with.
- Unit — optionally scope the task to a specific unit within a Multi-Tenant property. Leave blank for tasks that apply to the building or property as a whole, such as gutter cleaning or roof inspections.
- Task Name (required) — a descriptive name for the maintenance task. Maximum 100 characters.
- Category — the type of maintenance. Options are: HVAC, Plumbing, Electrical, Exterior, Interior, Appliance, Safety, Landscaping, Roofing, Other.
- Frequency (required) — how often this task needs to be performed:
- Monthly — every 30 days.
- Quarterly — every 90 days.
- Biannual — every 182 days (approximately every 6 months).
- Annual — every 365 days.
- Custom — a custom interval you define in days.
- Custom Frequency Days — required when Frequency is set to Custom. Enter the number of days between each occurrence.
- Last Completed Date — if this task has been performed before, enter the most recent completion date. This anchors the initial next due date calculation. If left blank, the next due date is set from today forward.
- Preferred Contractor — optionally assign a contractor from your Contractors list who typically handles this type of work. See Contractors & Companies.
- Linked CapEx Item — optionally link this task to an item in the CapEx Horizon to make the maintenance-to-capital relationship explicit. See How the Two Tools Work Together.
- Active — tasks are active by default. Toggle this off to pause a task without deleting it. Paused tasks do not appear on the Property Event Dashboard and are filtered from the default list view.
- Notes — any notes about the task, how it should be performed, or what to watch for. Maximum 255 characters.
How Next Due Date Works
Section titled “How Next Due Date Works”The next due date is what drives the PM Scheduler. It determines how tasks are sorted in the list and when they appear as events on the Property Event Dashboard.
When a task is created:
- If a Last Completed Date is provided, the next due date is set to Last Completed Date plus the frequency interval.
- If no Last Completed Date is provided, the next due date is set to today plus the frequency interval.
When a completion is logged:
- The next due date automatically advances to the completion date you logged plus the frequency interval.
- The task’s Last Completed Date updates to match the date you entered.
You never need to manually touch the next due date. Logging a completion handles it.
Logging a Completion
Section titled “Logging a Completion”When a PM task is done, log the completion directly from the task page. This keeps your history current and advances the next due date automatically.
To log a completion, open the task from the Preventive Maintenance task list and tap Log Completion. Fill in the following:
- Completion Date (required) — the date the task was actually performed.
- Notes — any notes about the work done, what was found, or anything to follow up on. Maximum 255 characters.
After saving, the task’s next due date and last completed date update immediately, and the completion is added to the task’s history.
Completion History
Section titled “Completion History”Every completion you log is saved to the task’s history. Tapping into a task lets you view a full record of every time that task was performed, what was noted, and when it was done. This gives you a permanent maintenance log per component per property.
This history is particularly useful when assessing the condition of a component, preparing for a property sale, or reviewing whether a CapEx item’s estimated date should be adjusted based on how consistently it has been maintained.
Task Templates
Section titled “Task Templates”The PM Scheduler includes a built-in library of common preventive maintenance tasks. When adding a new task, tap Use a Template to browse the available options. Selecting a template pre-populates the Task Name, Category, and suggested Frequency. You can adjust any field after applying a template before saving.
This makes it fast to get a full set of tasks configured when you first add a property to Foundations without entering everything from scratch. See the full list of included templates in Planning Overview.
Pausing and Resuming Tasks
Section titled “Pausing and Resuming Tasks”Tasks can be paused rather than deleted when they are temporarily not applicable. For example, a landscaping task that a seasonal service handles on their own schedule, or a task that applies to a unit that is temporarily offline.
To pause a task, open it and toggle the Active field off. Paused tasks:
- Are hidden from the default PM Scheduler list view.
- Do not generate events on the Property Event Dashboard.
- Retain all history, settings, and their current next due date.
Toggle Active back on to resume the task. The next due date picks up from where it was when the task was paused.
Linking PM Tasks to CapEx Items
Section titled “Linking PM Tasks to CapEx Items”A PM task can be linked to a specific item in the CapEx Horizon to make the relationship between preventive maintenance and capital planning explicit. For example, a PM task for annual HVAC servicing can be linked to the HVAC replacement item so it is clear that consistent servicing is what is keeping that component on its projected timeline.
When you regularly log completions and the component holds up better than the original estimate, you may want to push the linked CapEx item’s estimated date out to reflect the extended useful life. Foundations surfaces the linked CapEx item for easy access, but any date change is always your decision.
If a linked CapEx item is deleted, the link is cleared from the PM task automatically. The task itself is preserved and continues to function normally.